The Bar Council of India does not permit advertisement or solicitation by advocates in any form or manner. By accessing this website, www.khaitanco.com, you acknowledge and confirm that you are seeking information relating to Khaitan & Co of your own accord and that there has been no form of solicitation, advertisement or inducement by Khaitan & Co or its members. The content of this website is for informational purposes only and should not be interpreted as soliciting or advertisement. No material/information provided on this website should be construed as legal advice. Khaitan & Co shall not be liable for consequences of any action taken by relying on the material/information provided on this website. The contents of this website are the intellectual property of Khaitan & Co.

Please accept the above
Close

Search

See all results for ""

Indian competition authority imposes INR 2.9 million penalty for bid-rigging in the public procurement sector

29-Oct-2021

On 11 October 2021, the Competition Commission of India (CCI) imposed a cumulative penalty of INR 2.9 million on providers of engineering and construction services, for rigging a tender floated by GAIL (India) Limited (Informant).[1]

Background

The Informant, India’s largest state-owned natural gas and distribution company, routinely floats tenders to avail services related to, inter alia, restoration of oil-well sites and disposal of oil drilling wastes.

In 2019, the Informant’s internal vigilance team raised suspicions about the participation of two bidders, namely, PMP Infratech Private Limited (OP-1) and Rati Engineering (OP-2) (collectively, OPs). The internal vigilance team noted that both OPs:

Ø  

submitted bids using the same device or same network connection; and

Ø  

submitted bids within a day’s gap.

Based on this, the Informant approached the CCI alleging bid-rigging by OP-1 and OP-2. In 2020, the CCI formed a tentative view of contravention by the OPs and directed a Director General, CCI (DG) investigation.

Investigation

Confirming the Informant’s suspicions, the DG found evidence[2] of  commercially sensitive information being exchanged in a tender floated for the financial year (FY) 2018.

The DG observed that:

Ø  

the bids were submitted using the same Internet Protocol (IP) address;

Ø  

OP-2 forwarded clarifications sought by the Informant to OP-1; and

Ø  

the bids were submitted withing a day’s gap

Therefore, the DG’s investigation concluded that the OPs had engaged in bid-rigging. This was in contravention of Section 3(3)(d) read with Section 3(1) of the Competition Act, 2002 (Act).

CCI’s Findings

The CCI agreed with the findings of the DG. In doing so, the CCI rejected various arguments raised by the OPs. Certain observations are detailed below:

Defence of technical glitch

The CCI noted that both competing bids were submitted from the same IP address within a gap of one day. OP-2 argued that it was facing technical “Java” glitches due to which it requested OP-1 to submit the bid on its behalf.

The CCI rejected the argument owing to lack of evidence, also observing that it was rather egregious for competitors to use the same systems to submit a competing bid.

Assessment for remaining participants

OP-1 argued that the DG had failed to investigate the participation of two other bidders, without whose involvement the tender could not be successfully rigged.

The CCI rejected the argument since the bids by the remaining two entities were not “technically acceptable”. Therefore, their participation in the process held no significance. In any case, the CCI noted that Section 3(1) of the Act prohibits agreements that are likely to cause an appreciable adverse effect on competition (AAEC). Therefore, an agreement between the OPs in and of itself fell afoul of the Act.

Inability to independently response to queries

In relation to the DG’s finding of OP-2’s inability to answer the queries raised by Informant, OP-2 argued that the subject matter of the query was purely tax based (i.e., not pertaining to commercials of the bid). Therefore, forwarding the email was not indicative of collusion.

The CCI rejected the submission and noted that the Informant’s queries pertained to financial statements and the financial capability of the bidder and were, therefore, in relation to purely technical and commercial matters.

Further, CCI noted that the tender executive of OP-1 in his statements admitted that the Informant’s queries were sent by OP-2 to OP-1 “for appropriate response on behalf of Rati Engineering”.

Conclusion

The CCI found that the OPs colluded to a tender floated by the Informant in FY 2018 and, therefore, contravened Section 3(3)(d) read with Section 3(1) of the Act.

Further, due to failure to demonstrate that the contraventions occurred without the knowledge of the OPs key personnel, the CCI also held the director of OP-1 and partner of OP-2 liable under Section 48(1) of the Act.

Accordingly, both OPs and their key personnel were penalised to the tune of INR 2.9 million.

Comment

The following two aspects are noteworthy:

Ø  

The CCI continues to rely heavily of electronic evidence. While there has been a discernible trend towards reliance upon electronic evidence during COVID-19 pandemic, this trend is likely to remain a “sticky norm”.

Ø  

Paradoxically, in spite of the evidence described above, the CCI imposed a “symbolic monetary penalty”. The CCI’s rationale is the ambiguous phrase of “ends of justice in the facts and circumstances of the present case”. 

This ambiguity instantiates that the CCI continues to remain leery of penalty guidelines. Still, the Indian competition regime is no stranger to instances of bid-rigging in the public procurement sector. The CCI’s orders often observe that competition contraventions in the sector are particularly pernicious given the direct cost to public. To that extent, the CCI continues to vigorously pursue contraventions concerning public procurement.

-         Rahul Singh (Partner) & Alisha Mehra (Associate)

For any queries please contact: editors@khaitanco.com


[1] GAIL (India) Limited v PMP Infratech Private Ltd and Rati Engineering, Case No. 41 of 2019 of 11 October 2021.

[2] Evidence includes both, electronic and documentary evidence.

​​​​​​​

()

We have updated our Privacy Policy, which provides details of how we process your personal data and apply security measures. We will continue to communicate with you based on the information available with us. You may choose to unsubscribe from our communications at any time by clicking here.

For private circulation only

The contents of this email are for informational purposes only and for the reader’s personal non-commercial use. The views expressed are not the professional views of Khaitan & Co and do not constitute legal advice. The contents are intended, but not guaranteed, to be correct, complete, or up to date. Khaitan & Co disclaims all liability to any person for any loss or damage caused by errors or omissions, whether arising from negligence, accident or any other cause.

© 2021 Khaitan & Co. All rights reserved.

Mumbai

One Forbes
3rd & 4th Floors, No. 1
Dr. V. B. Gandhi Marg
Fort, Mumbai 400 001

Chennai

119/65, First Floor
Dr Radhakrishnan Salai
Mylapore
Chennai 600 004,
India

Noida

Max Towers
7th & 8th Floors
Sector 16B, Noida
Gautam Buddh Nagar
201 301 India

Singapore

Ocean Financial Centre
#37-02 10 Collyer
37th Floor Quay
Raffles Place 049315,
Singapore